TKRonaBoat
  • Blog
  • Photos
    • Carina, Our Caliber 40LRC
    • Cordelia, Our Ericson 35-3
    • Athias, our Pearson 28-1
    • Matilda, our Rhodes 18
    • Tender, our Cape Dory 10
    • Maine Cruise 2013
    • Maine Cruise 2012
    • Maine Cruise 2009
    • BVI Charter 2009
    • Maine Cruise 2007
    • Maine Cruise 2006
    • Maine Cruise 2005
    • Maine Cruise 2004
    • Table Rock, our family camp
    • Camp Weekend
    • Kingdom Trails 2012
    • Abacos Charter 2005
  • Projects
    • Caliber 40LRC Projects >
      • Galley Shelf Cabinet
      • Heater Installation
      • Traveler Upgrade
      • Transom Shower Mixer
      • Wind Generator
      • Winter Cover
      • OceanAir Recessed Skyscreens
      • Icebox Lid Support
      • Chainplate Rebedding
      • Topsides Polishing
      • Custom Cutting Board
      • Serpentine Belt Kit
      • Solar Panels
      • Fuel Polishing
      • Cabin Top and Cockpit Polishing
    • Ericson 35-3 Projects >
      • Interior Refinish
      • Cabin Sole Replacement
      • Mast Refinish
      • Galley Sink and Faucet
      • Rudder Position Sensor
      • Binacle Refinish
      • Transmission Replacement
    • Pearson 28-1 Projects >
      • Anchor Roller
      • Bottom Strip and Barrier Coat
      • Topside Refinish
      • Cockpit Cushions
      • Custom Backstay Radar Mount
      • Custom Holding Tank
      • Custom Mast Step
      • Custom Sink Cutting Board
      • Locker Struts
      • New Rudder Bushings
  • Videos
  • About Us
  • Links

Spring projects

3/31/2012

0 Comments

 
We are getting ready to remove the winter cover and haul the boat for some maintenance.  Before we can do that we need to complete some projects on deck.  First was to rebed all the chainplates.  I also potted the chainplate slots with thickened epoxy.  You can see the complete project here:  Chainplate Rebed

We also decided to remove and refinish the eyebrow.  This gave me the perfect opportunity to polish the cabintop.  So I removed the handrails and broke out the Makita buffer.  I used a Presta black wool pad and Presta Gel-coat compound.  Speed set at 3.5.
0 Comments

Almost through winter #2

3/11/2012

0 Comments

 
I feel guilty about not keeping up with our blog.  Yesterday we briefly met a couple who had read our blog and are now in the process of moving aboard full time.  Aside from our cruising blog, we have not posted anything for a long time. 
 
Well, we have almost made it through our second winter.  It was a mild one so not much to write about.  Although we did get to do a lot of mountain biking this year throughout the winter. 
 
Ous summer was a lot of fun.  We sailed most every weekend.  We enjoyed meeting new friends and had 3 different lobster bakes on islands.  Kathy is committed to breaking that record in 2012.  We had a great cruise in September again this year although the Northeast Harbor Race was canceled due to hurricane Irene.
 
We sailed right up through thanksgiving.  In fact, on black Friday, we sat on Jewel Island alone enjoying cocktails while watching the sunset.  The rest of the weekend we had great sailing.  We returned to S. Freeport Sunday evening so we could get the mast stepped for winter.
 
This winter I have taken on a few projects to further improve Carina.  We are rebeddedong the chain plates after potting the holes with thickened epoxy, refinishing the eyebrow, replacing all the instruments, sounder and autopilot, converting the reading lamps to LED.  We will also buff and polish the cabin sides and cockpit.

 
This spring we will do a long haul and tackle some additional
  projects including replacing the prop, cutlass bearing and zincs.  We
  will also take the time to repair the rudder, install the transducers for the
  new instruments and paint the bottom.  If time permits, I will also polish
  the topsides.  

0 Comments
    Winter 2015 Bahamas Cruise
    Summer 2014 nS Cruise
    Picture

    Archives

    June 2015
    April 2015
    January 2015
    November 2014
    October 2014
    September 2014
    August 2014
    July 2014
    June 2014
    May 2014
    April 2014
    March 2014
    February 2014
    September 2013
    July 2013
    June 2013
    May 2013
    April 2012
    March 2012
    May 2011
    January 2011
    September 2010

    Enter your email address to receive updates to our blog:

    Delivered by FeedBurner






Web Hosting by iPage